Re: Messos runs allocates too many Ubuntu executors on ASF Jenkins CI

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
2 messages Options
Reply | Threaded
Open this post in threaded view
|

Re: Messos runs allocates too many Ubuntu executors on ASF Jenkins CI

Olivier Lamy
I don't know if it's a good idea to try running performance test on asf
nodes...
they are used by every project so you never know how it is used and for
what, what is the configuration (virtualised or not can make a huge
difference)

On 11 February 2018 at 18:58, Tibor Digana <[hidden email]> wrote:

> I really have a problem to run my 11 parallel jobs on our Jenkins because
> Messos runs on most of the Ubuntu machines. Each Messos build takes cca 1
> hour to complete.
> This does not make any problem for you?
> The Messos is triggered by a scheduler and not by a commit.
>
> Now I have to decide if I should have no limit or use only ubuntu-1.
> The machine ubuntu-1 seems to be the most powerful machine and fits to my
> needs.
> The problem is that 11 parallel jobs is quite a lot anf then it happens
> that all jobs run on the ubuntu-1, the machine is overloaded and
> performance test fail.
>
> So what should I do?
> The IRC of INFRA is not available and I do not have free machines for my 11
> jobs to run for one hour.
>
> Thx
> Tibor
>



--
Olivier Lamy
http://twitter.com/olamy | http://linkedin.com/in/olamy
Reply | Threaded
Open this post in threaded view
|

Re: Messos runs allocates too many Ubuntu executors on ASF Jenkins CI

Tibor Digana-2
Can we discuss it in the evening?
I am in the office now.
I will explain, but I normally don't have much time.

On Mon, Feb 12, 2018 at 12:32 PM, Olivier Lamy <[hidden email]> wrote:

> I don't know if it's a good idea to try running performance test on asf
> nodes...
> they are used by every project so you never know how it is used and for
> what, what is the configuration (virtualised or not can make a huge
> difference)
>
> On 11 February 2018 at 18:58, Tibor Digana <[hidden email]> wrote:
>
> > I really have a problem to run my 11 parallel jobs on our Jenkins because
> > Messos runs on most of the Ubuntu machines. Each Messos build takes cca 1
> > hour to complete.
> > This does not make any problem for you?
> > The Messos is triggered by a scheduler and not by a commit.
> >
> > Now I have to decide if I should have no limit or use only ubuntu-1.
> > The machine ubuntu-1 seems to be the most powerful machine and fits to my
> > needs.
> > The problem is that 11 parallel jobs is quite a lot anf then it happens
> > that all jobs run on the ubuntu-1, the machine is overloaded and
> > performance test fail.
> >
> > So what should I do?
> > The IRC of INFRA is not available and I do not have free machines for my
> 11
> > jobs to run for one hour.
> >
> > Thx
> > Tibor
> >
>
>
>
> --
> Olivier Lamy
> http://twitter.com/olamy | http://linkedin.com/in/olamy
>



--
Cheers
Tibor